It is currently 19 Apr 2024 22:22

All times are UTC+01:00




Post new topic  Reply to topic  [ 31 posts ]  Go to page Previous 1 2 3
Author Message
PostPosted: 14 Sep 2015 20:02 
Offline

Joined: 09 Jun 2015 09:33
Posts: 28
Current ride: bmw 1150 gs
Location: kent
other progress - Lee didn't want to mount the battery behind the headstock, so now going to be mounted @ the left front, against the coil pack (looks neat, more mass centralization), Swing arm has been machined down on the LH spindle boss, so that the dymag can move over that side to get the belt run correct, took the dymag cush carrier off to machine the back face to move it back towards the centre of the wheel and lo and behold, Eric must have been a dymag fan because the belt sprocket bolt holes only bloody line up perfectly!
Told Lee that the sun shines on the righteous - he just said i was bloody lucky.
Have also picked up a Micron Serpent system from Dirty Harry when he was travelling past.
will update on more progress soon.


Top
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 31 posts ]  Go to page Previous 1 2 3

All times are UTC+01:00


Who is online

Users browsing this forum: No registered users and 9 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Limited